The bathroom remodel is completed!
Our guys are cranking out the jobs due to the great December weather.
- Installed 4″ wafer lighting throughout the bathroom ceiling.
- Installed heated/lighted bathroom vanity mirrors. They are beautiful.
- Installed a heated towel rack. Yes, folks, HEATED TOWEL RACK. We placed it on a timer switch so it doesn’t get left on. Safety first always.
- Hooked up electric in-floor heat.
- We installed a new bathroom fan/light on a humidistat to assure when high moisture is detected it automatically comes on and shuts off.


